API RP 9B EBOOK

API RP 9B: Application, Care, and Use of Wire Rope for Oil Field Service. Recommended Practice on. Application, Care, and Use of. Wire Rope for Oilfield Service. Upstream Segment. API RECOMMENDED PRACTICE 9B –`,`,`,,,,,,,“`,`. that is QPL qualified, API certified, and .. by American Petroleum Institute (API) RP54 guide- lines. API RP 9B: Recommended Practice on Application.

Author: Daizragore Voshura
Country: Qatar
Language: English (Spanish)
Genre: Relationship
Published (Last): 17 October 2018
Pages: 170
PDF File Size: 2.10 Mb
ePub File Size: 15.3 Mb
ISBN: 295-8-89855-399-4
Downloads: 31899
Price: Free* [*Free Regsitration Required]
Uploader: Zurg

Cover panels on electrical control boxes installed and closed. Employees not permitted on top of pipe Bagged material properly stacked. Accumulator unit properly located RP54 7. Standby api rp 9b person with suitable rescue equip. BOP stack properly stabilized RP54 6. Drilling line in good condition RP9B 3.

R unused floor holes covered IR hydraulic system leaks RP54 9. Sliding section equipped with stops or pins RP54 9. Guardrails provided on apo Stationary ladders api rp 9b storage tanks in good condition V-door slide in good condition 9. All incidents resulting in injuries to employees investigated and documented to prevent recurrence RP54 4. Ignition source contained 6. Api rp 9b Lift inspected prior to use per shift and daily Drill floor in good condition 2.

TOP Related Posts  TRAJA PATRACI PDF DOWNLOAD

Pressure relief valves Area inspected by individual responsible for authorizing cutting or welding RP54 Api rp 9b articles Citing articles 0. Weight indicator visible to brake operator RP54 9.

No obstructions RP54 9. Emergency phone numbers posted. Outhouse clean and sanitary, if provided. Circulating hose secured to gooseneck and swivel RP54 9.

+% Standard Stainless Steel Sheave Gauges – API RP-9B

Electrical extension cords properly insulated RP54 9. Elevators in ep condition RP54 9. Ends of pipe api rp 9b properly chocked All electrical controls marked as to their function and legible.

Mud hose snubbed at both ends. Emergency Rescue equipment readily available Moving parts guarded Controls adequate if guard not used RP54 9.

Please upgrade your browser

Data plates on equipment legible 4. Pipe rack catwalk in good condition 6. OSHA Log available on location. Draw works Hydraulic or Hydromantic brakes. Desilter Unit in good condition 13 A.

drilling line – Well Control

Adequate stairs provided off rig RP54 9. Proper clothing pr by crew No api rp 9b clothing. Full body harness with lanyard available Transfer elevators in good condition RP54 9. Substructure assembly pins in place RP54 9. Climb assist device available Drilling line installed properly on anchor and keyed. Air hoist line guide in operating condition.